- Introduction
Loop network of 22 buses, 11 generators and 22 transmission lines. Two local solutions exists within [0.95,1.05] voltage bounds.
- Case File
Network Diagram
Local solution data
Diagrams of Solutions in Rectangular Form
Fig1. Local Solution 1 | Fig2. Local Solution 2 |
Data for Local Solutions