
Thirty Nine Bus Network 1
Test Case Archive of Optimal Power Flow (OPF) Problems with Local Optima
Thirty Nine Bus Case 1
- Introduction
Modified from 39 bus New-England test network. Real and reactive power demands are halved. 2 local solutions exist within [0.95,1.05] voltage bounds.
- Case File
Network Diagram
Local solution data
Diagrams of Solutions in Rectangular Form
Fig1. Local Solution 1 | Fig2. Local Solution 2 |
Data for Local Solutions
(Back)