
Thirty Nine Bus Network 2
Test Case Archive of Optimal Power Flow (OPF) Problems with Local Optima
Thirty Nine Bus Case 2
- Introduction
Modified from 39 bus New-England test network. Real and reactive loads are scaled by 0.5, and only linear cost coefficients were considered. 16 local solutions exist within [0.95,1.05] voltage bounds.
- Case File
Network Diagram
Local solution data
Diagrams of Solutions in Rectangular Form
Data for Local Solutions
(Back)