
Thirty Nine Bus Network 4
Test Case Archive of Optimal Power Flow (OPF) Problems with Local Optima
Thirty Nine Bus Case 2
- Introduction
Modified from 39 bus New-England test network. Real and reactive power bounds scaled by 4 and cost coefficients were perturbed. 3 local solutions exist within [0.95,1.05] voltage bounds.
- Case File
Network Diagram
Local solution data
(Back)