LMBM-Three Bus Network
Test Case Archive of Optimal Power Flow (OPF) Problems with Local Optima
Three Bus Case
- Introduction
3 bus network with 2 generators, 1 synchronous compensator, and 3 transmission lines. Two local solutions exist within [0.90,1.10] voltage bounds.
- Case File
Network Diagram
Local solution data
(Back)