
Five Bus Network
Test Case Archive of Optimal Power Flow (OPF) Problems with Local Optima
Five Bus Case
- Introduction
5 bus network with 2 generators, 6 transmission lines. Three local solutions exist within [0.90,1.10] voltage bounds.
- Case File
Network Diagram
Local solution data
(Back)